Design
Approved from the first drawing
- What we design
- Detection and alarm, sprinkler and fire water networks, fire pumps, special hazard suppression and oxygen reduction, from the hazard and the building’s use.
- Approval
- Designed to Civil Defense requirements from the first drawing. Our engineer signs a pre-inspection record before the authority arrives.
- What you receive
- A submittal set per system: drawings, hydraulic calculations and the cause-and-effect matrix, then the approved material list and the Civil Defense approval file.
- Standards
- NFPA 13 · 14 · 20 · 72 · 2001 · SBC 801
From survey to approval
No step starts before the previous record is signed. An existing building? The retrofit route starts with a survey and a gap list to current code.
- 1 Survey Walk the building, list its hazards and every system already installed.
- 2 Design To NFPA and SBC 801, with hydraulic calculations and the cause-and-effect matrix.
- 3 Submit A submittal set per system, owned by our Engineering Manager, for the consultant’s review.
- 4 Approve A pre-inspection record signed by our engineer, then the Civil Defense approval file.