01 · Design
Approved from the first drawing
Fire protection design to NFPA and SBC 801, taken through Civil Defense approval.
What you receive
- A submittal set per system
- Hydraulic calculations and the cause-and-effect matrix
- The Civil Defense approval file

02 · Installation
Tested and handed over
Detection, sprinklers, pumps, gas, mist, foam and oxygen reduction systems, tested and handed over.
What you receive
- Signed test records
- The handover file
- An asset register

03 · Maintenance
Every certificate in date
Planned inspection and maintenance that keeps every system ready and every certificate in date.
What you receive
- Inspection and test to NFPA 25 and 72
- A priced list of deficiencies, closed out
- A report you can show the authority after every visit

04 · Compliance
No surprises at the next inspection
One signed record per asset, so the next inspection holds no surprises.
What you receive
- Every asset tagged and registered
- A pre-inspection record before the authority arrives
- Inspections, certificates and renewal dates in one digital record
Technologies
What we install, from detection to oxygen reduction
Designed to NFPA and SBC 801, and tested before anyone is asked to rely on it.
- Fire detection and alarm Addressable and conventional systems
- Aspirating smoke detection (ASD) Early warning for technical and sensitive areas
- Fire water networks Hydrants, sprinklers, wet and dry risers
- Fire pumps and control panels With the associated utilities
- Gas suppression FM-200, Novec, Inergen, CO₂
- Aerosol suppression For confined spaces
- Water mist For sensitive and heritage areas
- Foam systems Industrial, aviation, oil and gas facilities
- Wet chemical suppression For kitchen hoods
- Oxygen reduction systems (ORS) For areas where fire must be prevented, not just suppressed
- Emergency lighting and evacuation Systems that guide occupants out
- IoT-enabled fire safety monitoring Monitoring and integration with building systems

Get in touch
Send us the tender documents.
We read the fire scope and come back with clarifications before we price. Tell us about the project here and it goes straight to our sales engineers, who answer within one working day.
- info@kalis-sa.com
- Office
- Riyadh, Saudi Arabia