Skip to content
A sprinkler head on red pipework, with a Kalis technician walking below it

What we do

Design, installation, maintenance and compliance, from the first drawing to the next inspection.

A Kalis engineer pointing out a detail on the drawings to a client

01 · Design

Approved from the first drawing

Fire protection design to NFPA and SBC 801, taken through Civil Defense approval.

What you receive

  • A submittal set per system
  • Hydraulic calculations and the cause-and-effect matrix
  • The Civil Defense approval file
A Kalis technician programming a fire alarm control panel

02 · Installation

Tested and handed over

Detection, sprinklers, pumps, gas, mist, foam and oxygen reduction systems, tested and handed over.

What you receive

  • Signed test records
  • The handover file
  • An asset register
A Kalis engineer checking a valve set on red fire water pipework

03 · Maintenance

Every certificate in date

Planned inspection and maintenance that keeps every system ready and every certificate in date.

What you receive

  • Inspection and test to NFPA 25 and 72
  • A priced list of deficiencies, closed out
  • A report you can show the authority after every visit
A Kalis engineer showing a client an inspection record on a tablet

04 · Compliance

No surprises at the next inspection

One signed record per asset, so the next inspection holds no surprises.

What you receive

  • Every asset tagged and registered
  • A pre-inspection record before the authority arrives
  • Inspections, certificates and renewal dates in one digital record

Get in touch

Send us the tender documents.

We read the fire scope and come back with clarifications before we price. Tell us about the project here and it goes straight to our sales engineers, who answer within one working day.

Office
Riyadh, Saudi Arabia

An email address or a phone number, so we can answer you.